![]() Continued to drill and drive 30" epoxy tie bars at 24" OC. Epoxy coated smooth dowels They increase load transfer efficiency by allowing the leave slab to assume some of the load before the load is actually over it, thus reducing joint deflection and stress in the approach and leave slabs.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |